Aug 20, 2009  The test track is located at the Graniterock Company's A.R. Wilson Quarry and Asphalt Plant near Aromas, California. The design and construction of the test

get price

Warm-Mix Asphalt Study: Test Track Construction and First ...

Author(s): Jones, David; Wu, Rongzong; Tsai, Bor-Wen; Harvey, John T. Abstract: This is one of two reports describing the third phase of a warm-mix asphalt study

get price

Warm-Mix Asphalt Study: Test Track Construction and ...

Author(s): Jones, David; Wu, Rongzong; Tsai, Bor-Wen; Harvey, John T. Abstract: This is one of two reports describing the third phase of a warm-mix asphalt study

get price

Warm-Mix Asphalt Study: First-Level Analysis of Phase 2 ...

This first-level report describes the second phase of a warm-mix asphalt study, which compares the performance of a control mix, produced and constructed at

get price

Warm-Mix Asphalt Study: Test Track Construction and First ...

Warm-Mix Asphalt Study: Test Track Construction and First-Level Analysis of Phase 3a HVS and Laboratory Testing (Rubberized Asphalt, Mix Design #1) By

get price

STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION ...

Warm-Mix Asphalt Study: Test Track Construction and First-Level Analysis of Phase 1 HVS and Laboratory Testing . 4. TITLE AND SUBTITLE . 07/30/2008 . 5.

get price

Warm-Mix Asphalt Study: Test Track Construction and First ...

Warm-Mix Asphalt Study: Test Track Construction and First ...

get price

Warm-Mix Asphalt Study: Laboratory Test Results for ...

UCPRC Warm-Mix Asphalt Work Plan (UCPRC-WP-2007-01). WMA Study: Test Track Construction First-Level Analysis of Phase 1 HVS Laboratory Testing (RR-2008-11) Signatures: D. Jones 1st Author J. Harvey Technical Review D. Spinner Editor J. Harvey Principal Investigator S Logaraj AkzoNobel Proj. Manager

get price

Warm-Mix Asphalt Study: Test Track Construction and First ...

Warm-Mix Asphalt Study: Test Track Construction and First-Level Analysis of Phase 3a HVS and Laboratory Testing (Rubberized Asphalt, Mix Design #1) By David Jones, Rongzong Wu, Bor-Wen Tsai and John T. Harvey

get price

Warm-Mix Asphalt Study: First-Level Analysis of Phase 2 ...

This first-level report describes the second phase of a warm-mix asphalt study, which compares the performance of a control mix, produced and constructed at conventional hot-mix asphalt temperatures, with three mixes produced with warm-mix additives, produced and compacted at approximately 35°C (60°F) lower than the control. The

get price

An evaluation of warm-mix asphalt performance using ...

Jul 07, 2014  Warm-mix asphalt study: Test track construction and first-level analysis of phase 1 HVS and laboratory testing, Research Report: UCPRC-RR-2008-11, University of California Pavement Research Center, CA.

get price

W Waarrmm--MMiixx AAsspphhaalltt SSttuuddyy:: ck Co t- A si

Title: Warm-Mix Asphalt Study: Test Track Construction and First-Level Analysis of Phase 3b HVS and Laboratory Testing. (Rubberized Asphalt, Mix Design #2) Authors: David Jones, Rongzong Wu, Bor-Wen Tsai, and John T. Harvey Caltrans Technical Lead: Cathrina Barros Prepared for: Caltrans FHWA No: CA132221B Work submitted: 05/22/2013 Date June 2011

get price

An Evaluation of Warm-Mix Asphalt Performance using ...

Warm-mix asphalt study: Test track construction and first-level analysis of phase 1 HVS and laboratory testing D. Jones Quantification of pavement damage reduction due to vehicle wandering

get price

Publications - Harvey, John

Warm-Mix Asphalt Study: Test Track Construction and First-Level Analysis of Phase 3b HVS and Laboratory Testing (Rubberized Asphalt, Mix Design #2) New Method for Classifying and Quantifying Cracking of Flexible Pavements in Automated Pavement Condition Survey

get price

(PDF) Performance Evaluation of Warm- and Hot-Mix Asphalt ...

WARM MIX ASPHALT INVESTIGATION ON PUBLIC ROADS-A REVIEW. By Civil Engineering and Urban Planning: An International Journal (CiVEJ) Estimating correlations between rheological and engineering properties of rubberized asphalt concrete mixtures containing warm mix asphalt additive. By Chandra Akisetty and Tejash Gandhi. Download pdf.

get price

Flow Number Test and Assessment of AASHTO TP 79-13 Rutting ...

Jan 01, 2015  Warm-Mix Asphalt Study: Test Track Construction and First-Level Analysis of Phase 3a HVS and Laboratory Testing. Research report, UCPRC-RR-2011-02. University of California Pavement Research Center , Davis and Berkeley , 2011 .

get price

Author Detail - Publications – ITS Publications

Warm-Mix Asphalt Study: Test Track Construction and First-Level Analysis of Phase 3a HVS and Laboratory Testing (Rubberized Asphalt, Mix Design #1) 2011: Research Report: Warm-Mix Asphalt Study: Test Track Construction and First-Level Analysis of Phase 3b HVS and Laboratory Testing (Rubberized Asphalt, Mix Design #2) 2011: Research Report

get price

California Warm-Mix Asphalt HVS Study

Jan 01, 2008  Test track construction •Surfacing – All mix produced first –1 50 tons per mix – Stored in silos –1st 25 tons “wasted” • Process –P rime coat – 4 x lower lifts placed – Tack coat – 4 x upper lifts placed • Strain gages installed on base

get price

Performance Evaluation of Warm- and Hot-Mix Asphalt ...

A number of warm-mix asphalt (WMA) technologies are used to reduce the temperature at which the asphalt mixtures are produced and compacted, apparently without compromising the performance of the pavement. The main objective of this study is to determine whether the use of an innovative wax-based LEADCAP WMA additive influences the performance of the asphalt mixture, which is produced and ...

get price

APPENDIX A Topical Bibliography

study: test track construction and first-level analysis of phase 1 hvs and laboratory testing. “publication ca101562a. california department of ... 2.23 jones, d., wu, r., tsai, b., and harvey, j. t. “warm-mix asphalt study: test track construction and first-level analysis of phase 3b hvs and laboratory testing (rubberized asphalt, mix ...

get price

Warm-Mix Asphalt Study: Summary Report on Rubberized Warm ...

Downloadable! Warm-mix asphalt (WMA) is a relatively new technology. It was developed in response to needs for reduced energy consumption and stack emissions during the production of asphalt concrete, long hauls, lower placement temperatures, improved workability, and better working conditions for plant and paving crews. Studies in the United States and Europe indicate that significant ...

get price

Full-Depth Recycling Study: Test Track Construction and ...

California, and was originally constructed to assess the performance of seven different warm-mix asphalt technologies in a gap-graded rubberized asphalt mix. The design and construction of the test track was a cooperative effort between Caltrans, the UCPRC, and industry. The test track is 360 ft. by 53 ft. (110 m by 16 m) divided into four lanes.

get price

Read "Long-Term Field Performance of Warm Mix Asphalt ...

Warm-Mix Asphalt Study: Test Track Construction and First-Level Analysis of Phase 1 HVS and Laboratory Testing. Final Report UCPRA-RR-2008-11, University of California Pavement Research Center, University of Californiaâ Davis, University of Californiaâ Berkeley.

get price

Author: D. Jones

3. Warm-Mix Asphalt Study: Test Track Construction and First-Level Analysis of Phase 2 HVS and Laboratory Testing and Phase 1 and Phase 2 Forensic Assessments (UCPRC-RR-2009-02) 4. Warm-Mix Asphalt Study: First-Level Analysis of Phase 2b Laboratory Testing on Laboratory Prepared Specimens (UCPRC-RR-2012-07) 5.

get price

California Warm-Mix Asphalt HVS Study

Jan 01, 2008  Test track construction •Surfacing – All mix produced first –1 50 tons per mix – Stored in silos –1st 25 tons “wasted” • Process –P rime coat – 4 x lower lifts placed – Tack coat – 4 x upper lifts placed • Strain gages installed on base

get price

Preliminary Study from Korea: Warm-Mix Asphalt Request PDF

Warm-Mix Asphalt Study: Test Track Construction and First-Level Analysis of Phase 1 HVS and Laboratory Testing. Davis and Berkeley, CA: University of

get price

Warm-Mix Asphalt Study: Summary Report on Rubberized Warm ...

Downloadable! Warm-mix asphalt (WMA) is a relatively new technology. It was developed in response to needs for reduced energy consumption and stack emissions during the production of asphalt concrete, long hauls, lower placement temperatures, improved workability, and better working conditions for plant and paving crews. Studies in the United States and Europe indicate that significant ...

get price

Warm-Mix Asphalt

implementation of warm mix, the industry and researchers have developed guidelines for best practices in warm-mix asphalt production and construction.5 PERFORMANCE Warm-mix technologies are being tested at the National Center for Asphalt Technology’s Pavement Test Track. At this track, trucks hauling loads that are much heavier than

get price

Author Detail - Publications – ITS Publications

Warm-Mix Asphalt Study: Test Track Construction and First-Level Analysis of Phase 3a HVS and Laboratory Testing (Rubberized Asphalt, Mix Design #1) 2011: Research Report: Warm-Mix Asphalt Study: Test Track Construction and First-Level Analysis of Phase 3b HVS and Laboratory Testing (Rubberized Asphalt, Mix Design #2) 2011: Research Report

get price

APPENDIX A Topical Bibliography

study: test track construction and first-level analysis of phase 1 hvs and laboratory testing. “publication ca101562a. california department of ... 2.23 jones, d., wu, r., tsai, b., and harvey, j. t. “warm-mix asphalt study: test track construction and first-level analysis of phase 3b hvs and laboratory testing (rubberized asphalt, mix ...

get price

ACCELERATED PERFORMANCE TESTING ON THE 2006 NCAT

The Test Track underwent its first reconstruction phase in the summer of 2003. After the second phase of testing (i.e., the second 10 million ESALs) had been completed, twenty-two test sections at the Test Track were either milled or removed down to the subgrade to prepare for the third phase of testing at the Test Track. Reconstruction for Phase

get price

References - Martins Zaumanis

Jones D, Wu R, Tsai BW et al (2008) Warm-mix asphalt study: Test Track Construction and First-Level Analysis of Phase 1 HVS and Laboratory Testing. UCPRC-RR-2008-11. Berkley, CA . Kriech A, Osborn L, Prowell B, et al (2011) Comparison of worker breathing zone exposures between hot mix asphalt and warm mix asphalt applications.

get price

Performance Evaluation of Warm- and Hot-Mix Asphalt ...

A number of warm-mix asphalt (WMA) technologies are used to reduce the temperature at which the asphalt mixtures are produced and compacted, apparently without compromising the performance of the pavement. The main objective of this study is to determine whether the use of an innovative wax-based LEADCAP WMA additive influences the performance of the asphalt mixture, which is produced and ...

get price

Full-Scale Structural Evaluation of Fatigue ...

Jan 01, 2011  Warm-mix asphalt (WMA) ... Article first published online: January 1, 2011; Issue published: January 1, 2011 ... Timm, D. H. Design, Construction, and Instrumentation of the 2006 Test Track Structural Study. Report 09-01. National Center for Asphalt Technology, Auburn University, ...

get price

Evaluation of Field Performance of Warm-mix Asphalt ...

Dec 02, 2013  Prowell, Brian D., Graham C. Hurley, and Everett Crews. “Field performance of warm-mix asphalt at national center for asphalt technology test track” Transportation Research Record: Journal of the Transportation Research Board 1998.1 (2007): 96-102.